BOREWELL LIFTING MACHINE

Authors

  • Sutar Prasad Mallinath SVSMD’s K.K.I.Polytechnic, Akkalkot
  • Desai Mahesh Vilas SVSMD’s K.K.I.Polytechnic, Akkalkot
  • Desai Sagar Ramesh SVSMD’s K.K.I.Polytechnic, Akkalkot
  • Prof. Parmshetti S. C. Lect.in Mechanical Department SVSMD’s K.K.I.Polytechnic, Akkalkot

Abstract

This paper discuss the innovations that took place in the Bore well motor lifting process from the earliest time and also includes the future scope. The paper also shows Borwell  lifting with its advantages and limitation. Paper also provides the detail information and steps for lifting process. Key words: Installation, Lifting, Chain Pulley Mechanism, Bore well

Downloads

Download data is not yet available.

References

Chennai-600119,” Modeling, Analyzing and Fabrication of Lifting SPRhook for Bore well Pipe” , 2014 IJEDR | Volume 2, Issue 1 | ISSN: 2321-9939 .

Guidelines of Construction & Maintenance of Bore wells and Tube wells, 2014 Research Designs and Standards Organization, Lucknow – 226011.

1Dr. C.N. Sakhale, 2D.M. Mate 3Subhasis Saha, Tomar Dharmpal, Pranjit Kar, Arindam Sarkar, Rupam Choudhury, Shahil Kumar, “An Approach to Design of Child Saver Machine for Child Trapped in Borehole” , Volume 1, Issue 2, October-December, 2013, pp. 26-38,

© IASTER 2013

Big Bore Well Drilling in New Zealand – A Case Study, John Bush and Christine Siega, Proceedings World Geothermal Congress 2010 Bali, Indonesia, 25- 29 April 2010.

Selection, installation, operation and maintenance of submersible pump set – code of practice, DRAFT INDIAN STANDARD IS 14536.

http://en.wikipedia.org/wiki/borewell motor lifting machine in India.

Downloads

Published

2020-05-05

How to Cite

[1]
Sutar Prasad Mallinath, Desai Mahesh Vilas, Desai Sagar Ramesh, and Prof.Parmshetti S.C., “BOREWELL LIFTING MACHINE”, IEJRD - International Multidisciplinary Journal, vol. 5, no. 3, p. 8, May 2020.

Issue

Section

Articles